|
1) How safe is my design in China
Answer:
For the protection of intellectual property, we cooperate
with legal advisers to draft disclosure agreement in order to protect the
design of product. These declarations need to be signed by the Chinese
partner. Besides, in case of composite products, we can also chose to
separate production and assembly to minimize the risk.
2) What is the delivery time of a prototype?
Answer: In case it is a prototype without the need of
making a mould, than we in general it will take a week to produce it and 3
days per express to send it.
New Question: How long does it take before we can see the
first production sample? This mainly depends on the complexity and the
size of the product. As for plastic it will take approximately take 4 to 6
weeks to produce a first sample. Aluminium high pressure injection will
take up to 8 weeks, but for sand casting the delivery time for the first
new sample will be 4 weeks.
3) How do I arrange the export of my product?
Answer: Goods can be delivered to your door, this means sthat you
don’t need to worry about complicated export procedures or logistics
problems.
4) Can you also provide factories who can produce high
technology processes?
Answer: Yes, this is possible, but it depends on the required
technology. China can in some circumstances produce high-tech products
that will not be less in quality than western products. In other fields
they still have to improve a lot. We have a database in which we can look
or when special techniques are required, we can use our sourcing team to
find suitable suppliers to localize this technique.
5) What are the cost to deliver the first sample?
Answer: This depends on the product and on the factory. As soon as
we have your inquiry, we can immediately give you the answer.
6) What are the payment term ?
Answer: Depending on the type of assignment we charge a prepayment
of maximum 50% at order and the left over need to be paid before shipment.
7) Are you able to import special material for your
product?
Answer: Yes. Because the material will be imported and exported
after production, it means that there doesn’t need to be any tax levied on
the products. However, the import procedure is very complex, but we have
the necessary experience.
|