Our company is a Ningbo professional Chinese machine plants exporter and solution provider, specialized in latex products production, technology design, production training, equipment design, manufacture and installation of equipments. We offer for export, including technical assistance complete plants for latex condoms production and latex gloves production.
The latex gloves and condoms our machines produce can get easily the FDA certification and are widely exported worldwide.
Main machines and procedures
Mixing equipment — Forming & shaping equipments — Post vulcanization equipments — Electric pinhole testing equipments—Packing equipments — Testing equipments
Three-time latex dipping condom production line
Technical Parameters (one line):
Shape dimension(L×W×H): 52.2m X 3m X 3.9m
Main motor transmission: 2.2KW X 3 Sets
Thermal energy consumption (steam): 1T/h
Installed capacity: 70KW
Water consumption: 6T/h
Chain length of production line: 182m
Mould space: 80mm
Chain linear velocity: 0~12m/minute
Quantity of moulds: 4,500pcs
Productivity: 350,000pcs/24h
Soft water: 10MT/24h
Characteristics:
• Adopt advanced three-time latex dipping technology with advanced process layout and diversified adjustment functions of production technology.
• Templates are fabricated with SS304 plate. The whole chain operates with three sets of main motors, and varying frequency speed control system. The equipments are running smoothly and steadily.
• The whole line is equipped with stainless steel plates in the ceiling, and sealed with plastic steel.
• The equipment is designed reasonably and effectively to prevent the condom from bubble head, flow reversals, skewing, beading problems, pinholes etc.
• Can produce different kinds of common and irregular-shaped condoms with shiny side, granule, thread, and multicolor.
• Adopt the fully-enclosed stainless steel tubes to convey the latex material of production under pressure.
• Energy saving design in drying structure, with a consumption of 19.5kgs of standard coal per 10,000 condoms.
Complete technical data & products specifications (.pdf document)
Factory layout for a latex condom machine plant (2 lines) (.jpg document)
Indicative workforce requested for a latex condom machine plant
Worker number can be adjusted after operating with more skill.
a.Payed by working hours
| |
1 Line (workers) |
2 Lines (workers) |
| Mixing |
3 |
4 |
| Forming & shaping |
6 |
9 |
| Post vulcanization |
3 |
6 |
| Electric pinhole testing |
24 |
48 |
| Pre-test, mid-contro |
3 |
3 |
| Maintenance |
2 |
2 |
| Total |
41 |
72 |
b.Pay by working pieces
machine packing, carton packing, spraying code ,seal, pack 70 persons/2 Lines.
Indicative budget
Important: the minimum budget is about 500,000 US$ EXW
40,000 to 100,000 latex gloves pairs machine plants
We export also Latex gloves machine plant
The production
incluses five procedures,
1. Mixing equipments
2. Post-vulcanizing equipments
3. Host configuration of the glove production line
4. Supporting facilities
5.Testing and lab equipments
We offer three lines with 40,000 pairs per day, with 80,000 pairs per day and with 100,000 pairs per day.
Complete technical data & products specifications (.pdf document)
Requested areas for a comple glove machine plant
Factory area calculated by double 52M lines
Shaping shop: 72m*12m
Testing and package: 82m*18m Compounding workshop:10m*12m*4 storeys
| Auxiliary factory (Under 4 lines) |
L |
W |
H |
storeys |
Area |
| 1 |
Latex storeroom |
|
20 |
13 |
4,1 |
1 |
260 |
| 2 |
Chemical material storeroom |
20 |
13 |
4,1 |
1 |
260 |
| 3 |
Power distribution room |
7,5 |
10 |
4 |
1 |
75 |
| 4 |
Drive |
|
|
7,5 |
10 |
4 |
1 |
75 |
| 5 |
Maintenance room |
|
7,5 |
10 |
4 |
1 |
75 |
| 6 |
Hardware storeroom |
|
7,5 |
10 |
4 |
1 |
75 |
| 7 |
Boiler room |
|
10 |
20 |
7 |
1 |
200 |
| 8 |
EO sterilization workshop |
17 |
15 |
7 |
1 |
255 |
| 9 |
Mould room & coagulant room ect. |
81 |
4 |
4 |
1 |
324 |
|
Total |
|
|
|
|
|
|
1599M2 |
Indicative workforce requested for a latex gloves machine plant
Workers number can be adjusted after operating with more skill.
a.Payed by working hours
| |
1 Line (workers) |
2 Lines (workers) |
| Mixing |
3 |
4 |
| Forming & shaping |
21 |
42 |
| Post vulcanization |
3 |
6 |
| Quality testing |
3 |
5 |
| Fast testing |
1 |
1 |
| Maintenance |
3 |
4 |
| Total |
34 |
62 |
b.Pay by working pieces
Workers for blow test and for packing
Indicative budget
Important: the minimum budget starts about 500,000 US$ EXW
------------------------
The customers who can actually manage the minimum workshop and budget to set-up a machine plant are welcome to contact us to get a questionnaire to go further according their precise project. We'll welcome qualified customers to visit us in China.